Skip to Main Content
Table 4

Summary of the cut-and-fill operation results. DOI: https://doi.org/10.1525/elementa.333.t4

Time intervalDeposited material (m3)Eroded material (m3)Net change (m3)Accuracy (m3)

 
1852 to 1911 8.4 × 107 9.2 × 105 8.3 × 107 ±2.6 × 107 
1911 to 1952 5.2 × 106 1.4 × 107 –8.8 × 106 ±3.2 × 107 
1952 to 1999 1.7 × 107 1.0 × 107 7.0 × 106 ±2.2 × 107 
Sum of net changes from 1852 to 1999 – – 8.1 × 107 ±4.6 × 107 
1852 to 1999 8.8 × 107 7.5 × 106 8.1 × 107 ±1.5 × 107 
Time intervalDeposited material (m3)Eroded material (m3)Net change (m3)Accuracy (m3)

 
1852 to 1911 8.4 × 107 9.2 × 105 8.3 × 107 ±2.6 × 107 
1911 to 1952 5.2 × 106 1.4 × 107 –8.8 × 106 ±3.2 × 107 
1952 to 1999 1.7 × 107 1.0 × 107 7.0 × 106 ±2.2 × 107 
Sum of net changes from 1852 to 1999 – – 8.1 × 107 ±4.6 × 107 
1852 to 1999 8.8 × 107 7.5 × 106 8.1 × 107 ±1.5 × 107 
Close Modal

or Create an Account

Close Modal
Close Modal