Skip to Main Content
Table 2

Determination of annual PEWR and EEWR using observed, reconstructed and projected data. DOI: https://doi.org/10.1525/elementa.340.t2

V annual (107m3)Observed period (1963–2015)Reconstruction (1590–2015)Projection (2050–2098)

 
Q95 74.90 96.30 37.50 
Q85 99.80 122.00 49.00 
Q50 162.00 181.00 99.10 
Q5 363.00 340.00 230.00 
Ecological flow 35.80 38.40 18.80 
PEWR 63.90 83.10 30.30 
EEWR 299.00 257.00 199.00 
V annual (107m3)Observed period (1963–2015)Reconstruction (1590–2015)Projection (2050–2098)

 
Q95 74.90 96.30 37.50 
Q85 99.80 122.00 49.00 
Q50 162.00 181.00 99.10 
Q5 363.00 340.00 230.00 
Ecological flow 35.80 38.40 18.80 
PEWR 63.90 83.10 30.30 
EEWR 299.00 257.00 199.00 
Close Modal

or Create an Account

Close Modal
Close Modal