Skip to Main Content
Table 3.
Descriptive Statistics for Estimated Control.
 Sample One Sample Two 
Condition Actual control Estimated control M (SD) t df Subjective control M (SD) t df 
Zero contingency, 25% probability 11.33 (11.16) 9.25*** 82 10.83 (11.7) 5.85*** 39 
Zero contingency, 75% probability 17.51 (16.35) 9.40*** 76 23.71 (20.08) 7.65*** 41 
75% positive contingency 75 38.2 (24.6) -13.4*** 79 49.18 (24.15) -7.25*** 45 
 Sample One Sample Two 
Condition Actual control Estimated control M (SD) t df Subjective control M (SD) t df 
Zero contingency, 25% probability 11.33 (11.16) 9.25*** 82 10.83 (11.7) 5.85*** 39 
Zero contingency, 75% probability 17.51 (16.35) 9.40*** 76 23.71 (20.08) 7.65*** 41 
75% positive contingency 75 38.2 (24.6) -13.4*** 79 49.18 (24.15) -7.25*** 45 

Note. * p < .05 ** p < .01 *** p < .001a Results from one-sample t-tests comparing the end-of-task subjective control measure to actual control.

Close Modal

or Create an Account

Close Modal
Close Modal