I argue that in the nave of Saint-Philibert at Tournus, the design, execution, and chronology of construction were different, and more complicated, than previously proposed. In the building, points of interruption occur at quite unexpected-although often structurally logical-locations. These changes reveal new information about the masons who built the church. The masons integrated architecture and sculpture; merged different traditions of building; and coordinated the processes of design, construction, and structure. Within campaigns they refined the design of the building, and between campaigns they radically altered the masonry, moldings, and capital decoration. Contradicting the idea that churches were first conceived and then built, at times during the construction at Tournus masons combined the separate stages of planning and execution.
Skip Nav Destination
Article navigation
Mar. 2001
Research Article|
March 01 2001
The Nave of Saint-Philibert at Tournus
Journal of the Society of Architectural Historians (2001) 60 (1): 46–67.
Citation
C. Edson Armi; The Nave of Saint-Philibert at Tournus. Journal of the Society of Architectural Historians 1 March 2001; 60 (1): 46–67. doi: https://doi.org/10.2307/991678
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.