The Czech Republic’s Temelín nuclear power plant provoked the worst relations between it and Austria. This article identifies novel, unexpected roles that the EU played in that dispute: mediator, framework-setting; absenteeism; foil; and belated enforcer. The EU ultimately altered the nature of the dispute and can be seen to have inadvertently defended a non-member state’s interests against those of an existing member.

This content is only available via PDF.